This project was the result of a turnkey proposal from Brown Engineering Group to Mahomed Mussa Wholesalers. Brown Engineering undertook all design work, civil work and structural work for this job. This was a brown field job with the previous building demolitions being a key technical aspect of the work.
The brief was for a double storey wholesale building that could store stock on the first-floor level.
The project integrated admin and office space and a prayer room.
Configuration:
Double storey lattice trussed structure.
36mx36m = 1300m2 building. The building height was 4.25m to first floor level and 8m to the underside of building trusses.
86 tons of steel
First floor level was designed and constructed as a composite Bond-Dek/structural steel/concrete deck.
Chromadeck cladding and roofing in 0.47mm Traffic Green sheet.